A fully optimized document control system built for welding contractors — organize every project record and generate a completed turnover package, all in one place.
I spent years running QA/QC on welding projects, and watched the same gaps repeat on every job: procedures scattered across binders and shared drives, turnover packages assembled by hand the week the job closed, traceability that only held up if nobody asked the wrong question at the wrong time. Hot Pass is the document control system I wished existed on those jobs — built specifically for the small and mid-size welding contractors who live and die by traceability, not retrofitted from generic project management software.
Every project gets its own record — organized, revision-tracked, and ready to hand off the moment the job closes.
Joint ID, welder, WPS, heat number, and date — logged per weld, not per assumption.
WPS records — process, position, base material, filler metal, and PQR reference.
Procedures, PQRs, and certifications tracked by revision, type, and status.
Welder qualification status and expiration dates, tracked per project.
Root cause and corrective action documented per NCR, through to closure.
RT, UT, MT, and PT results tied directly to the joint examined.
Test pressure, medium, and duration, logged per system or line.
PWHT soak temperature and time, tied to the joint or spool treated.
Multi-page PDF redlining with color-coded heat number and weld number callouts.
Field photos geotagged and pinned to a live map, organized by joint.
One-click completed job book — cover page, table of contents, every section — ready to print to PDF.
Every table exports straight to Excel-ready CSV, one click.
Real feedback from real users — every submission is reviewed before it goes live.
Log in to access your projects.
Every plan includes full access to every project and every tab — no feature gating.