← All blank formsTwo sides. Set margins to Default and turn OFF “Headers and footers” before printing.
Bell Hole Report
Pipeline exposed and directly examined — the dig, the pipe, and what the coating and CP were doing.
HOT PASS
QA/QC Document Control hotpassqc.com
Project
Job No.
Client
Sheet ____ of ____
ILI feature verificationLeak / repairCorrosion assessmentECDA / direct assessmentCIS / CP investigationTie-in or fittingCasing investigationThird-party damageDepth of coverOther
In-Line Inspection Feature — what the tool said before anyone dug
Excavation
YesNo
YesNo
Pipe Data — as found, not as recorded
Coating & Cathodic Protection — readings taken before the coating is disturbed
FBECoal tar enamelAsphaltTape wrapShrink sleeveLiquid epoxyWaxBare
GoodFairPoorDisbondedHolidaysWrinkled / tentedWater under coatingSoil stress damage
HP-BH-01 | Rev 0 | Side 1 of 2Free blank form from HOT PASS QA/QC — hotpassqc.com
Bell Hole Report
Direct examination, wall thickness readings, assessment, disposition and backfill.
HOT PASS
QA/QC Document Control hotpassqc.com
Project
Job No.
Client
Report No.
No defect foundGeneral corrosionPittingInternal corrosionGougeDentCrackArc burnLaminationSeam anomalyGirth weld anomalyMechanical damage
O’clock \ Axial
0″
3″
6″
9″
12″
15″
18″
21″
24″
12:00
1:30
3:00
4:30
6:00
7:30
9:00
10:30
Remaining wall thickness at each point, not pit depth — say which in the datum box if the job works the other way round. Record the deepest reading in the row below whether or not it landed on a grid point.
Remaining Strength & Disposition
No repair — recoat onlyGrind and recoatComposite wrapType A sleeveType B sleevePipe replacementDeferred — engineering review
Yes — barricadedNo
Notes & Observations
Examined by / Date
NDE technician / Level / Date
Integrity / engineering review / Date
HP-BH-01 | Rev 0 | Side 2 of 2Free blank form from HOT PASS QA/QC — hotpassqc.com